{"help": "https://data.sumbawabaratkab.go.id/ar/api/3/action/help_show?name=datastore_search", "success": true, "result": {"include_total": true, "limit": 100, "records_format": "objects", "resource_id": "818aa8a0-c216-4535-8243-7fc2b79316d4", "total_estimation_threshold": null, "records": [{"_id":1,"No":"1.0","Pekerjaan":"Pembangunan Gapura Jalan Lingkungan Temempang Kel. Bugis Kec. Taliwang","Jenis Pekerjaan":"Hollow Galvanis","Panjang (m)":"","Lebar (m)":""},{"_id":2,"No":"2.0","Pekerjaan":"Penataan Infrastruktur Kawasan Permukiman Lingkungan Bugis B Kel. Bugis Kec. Taliwang","Jenis Pekerjaan":"Paving Block","Panjang (m)":"92.4","Lebar (m)":"3.2"},{"_id":3,"No":"3.0","Pekerjaan":"Peningkatan Jalan Lingkungan Gang H. Amek Lingk. KTC Kel. Menala Kec. Taliwang","Jenis Pekerjaan":"Paving Block","Panjang (m)":"115.4","Lebar (m)":"3.56"},{"_id":4,"No":"4.0","Pekerjaan":"Peningkatan Jalan Lingkungan Telaga Bertong Tb. 212 Kel. Telaga Bertong Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu, Timbunan Biasa dan Timbunan Pilihan Berbutir","Panjang (m)":"237.0","Lebar (m)":"3.6"},{"_id":5,"No":"5.0","Pekerjaan":"Peningkatan Jalan Lingkungan Gang Pondok Al- Manar Desa Seloto Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu dan Timbunan Biasa","Panjang (m)":"59.8","Lebar (m)":"1.3"},{"_id":6,"No":"6.0","Pekerjaan":"Pembangunan Jalan Lingkungan RT.04 RW.03 Lingk. Kokar Dalam Kel. Telaga Bertong Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu, Timbunan Biasa dan Timbunan Pilihan Berbutir","Panjang (m)":"87.0","Lebar (m)":"3.0"},{"_id":7,"No":"7.0","Pekerjaan":"Pembangunan Jalan Lingkungan RT.12 Dusun Lenang Late Desa Seloto Kec. Taliwang","Jenis Pekerjaan":"Paving Block, Talud Pasangan Batu dan Timbunan Biasa","Panjang (m)":"125.0","Lebar (m)":"3.0"},{"_id":8,"No":"8.0","Pekerjaan":"Pembangunan Jalan lingkungan RT.01 RW.10 Lingk. Bale Santong Kel. Kuang Kec. Taliwang","Jenis Pekerjaan":"Talud Pasang Batu, Timbunan Biasa dan Timbunan Pilihan Berbutir","Panjang (m)":"191.8","Lebar (m)":"4.75"},{"_id":9,"No":"9.0","Pekerjaan":"Peningkatan Jalan Lingkungan Bertong B RT.01 RW.07 Kel. Telaga Bertong Kec. Taliwang","Jenis Pekerjaan":"Paving Block","Panjang (m)":"78.4","Lebar (m)":"3.1"},{"_id":10,"No":"10.0","Pekerjaan":"Peningkatan Jalan Lingkungan SDN 15 Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu, Timbunan Biasa dan Paving Block","Panjang (m)":"80.0","Lebar (m)":"4.0"},{"_id":11,"No":"11.0","Pekerjaan":"Peningkatan Jalan Lingkungan Gang Delima Desa Seloto Kec. Taliwang","Jenis Pekerjaan":"Paving Block dan Timbunan Biasa","Panjang (m)":"117.0","Lebar (m)":"3.5"},{"_id":12,"No":"12.0","Pekerjaan":"Peningkatan Jalan Lingkungan Tengkal Makki Desa Kertasari Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu dan Timbunan Pilihan Berbutir","Panjang (m)":"440.0","Lebar (m)":"4.0"},{"_id":13,"No":"13.0","Pekerjaan":"Peningkatan Jalan Lingkungan Gang RT. 02 Lingkungan Bugis A Kel. Bugis Kec. Taliwang","Jenis Pekerjaan":"Paving Block","Panjang (m)":"38.4","Lebar (m)":"3.5"},{"_id":14,"No":"14.0","Pekerjaan":"Pembangunan Jalan Lingkungan Gang IV Lingkungan Kokar Dalam RT 03 RW.04 Kelurahan Telaga Bertong Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu, Timbunan Biasa dan Timbunan Pilihan Berbutir","Panjang (m)":"162.2","Lebar (m)":"3.74"},{"_id":15,"No":"15.0","Pekerjaan":"Pembangunan Jalan Lingkungan Pejorok RT.04 RW.06 Kelurahan Dalam Kec. Taliwang","Jenis Pekerjaan":"Paving Block Drainase Pasangan Batu","Panjang (m)":"107.0","Lebar (m)":"4.0"},{"_id":16,"No":"16.0","Pekerjaan":"Peningkatan Jalan Gang Restorasi RT.03 RW.03 Lingk. Kokar Dalam Kel. Telaga Bertong Kec. Taliwang","Jenis Pekerjaan":"Paving Block","Panjang (m)":"158.2","Lebar (m)":"4.2"},{"_id":17,"No":"17.0","Pekerjaan":"Peningkatan Jalan Lingkungan Gang Saguni Lingk. Perjuk Kel. Telaga Bertong Kec. Taliwang","Jenis Pekerjaan":"Paving Block","Panjang (m)":"180.0","Lebar (m)":"4.4"},{"_id":18,"No":"18.0","Pekerjaan":"Peningkatan Jalan Lingkungan RT.02 RW.02 dan RT.03 RW.02 Lingk. Telaga Baru B Kel. Telaga Bertong Kec. Taliwang","Jenis Pekerjaan":"Paving Block dan Timbunan Pilihan Berbutir","Panjang (m)":"200.9","Lebar (m)":"3.56"},{"_id":19,"No":"19.0","Pekerjaan":"Peningkatan Jalan Lingkungan Gang Makam Loka RT.01 RW.06 Lingk. Bertong B Kel. Telaga Bertong Kec. Taliwang  (Lanjutan)","Jenis Pekerjaan":"Lapis Penetrasi Macadam","Panjang (m)":"357.6","Lebar (m)":"3.26"},{"_id":20,"No":"20.0","Pekerjaan":"Peningkatan Jalan Lingkungan RT.05 RW.07 Balisung Batu Bele Kel. Menala Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu, Timbunan Biasa dan Paving Block","Panjang (m)":"98.6","Lebar (m)":"4.33"},{"_id":21,"No":"21.0","Pekerjaan":"Peningkatan Jalan Lingkungan Gang Bero RT.04 RW.01 Lingk. Telaga A Kel. Telaga Bertong Kec. Taliwang","Jenis Pekerjaan":"Paving Block","Panjang (m)":"357.6","Lebar (m)":"4.27"},{"_id":22,"No":"22.0","Pekerjaan":"Pembangunan Jalan Lingkungan Bertong B Kel. Telaga Bertong Kec. Taliwang (Lanjutan)","Jenis Pekerjaan":"Talud Pasangan Batu, Timbunan Biasa dan Paving Block","Panjang (m)":"161.3","Lebar (m)":"3.6"},{"_id":23,"No":"23.0","Pekerjaan":"Peningkatan Jalan Lingkungan RT.04 RW.03 Lingk. Kenangan Bawah Kel. Arab Kenangan Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu, Timbunan Biasa dan Paving Block","Panjang (m)":"102.5","Lebar (m)":"2.8"},{"_id":24,"No":"24.0","Pekerjaan":"Peningkatan Jalan Lingkungan Gang Masjid Ucok Kel. Telaga Bertong Kec. Taliwang","Jenis Pekerjaan":"Lapis Penetrasi Macadam, Talud Pasangan Batu dan Timbunan Biasa","Panjang (m)":"110.0","Lebar (m)":"4.8"},{"_id":25,"No":"25.0","Pekerjaan":"Peningkatan Jalan Lingkungan Gang Baba Nanga Kel. Telaga Bertong Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu, Timbunan Biasa dan Paving Block","Panjang (m)":"144.2","Lebar (m)":"4.12"},{"_id":26,"No":"26.0","Pekerjaan":"Peningkatan Jalan Lingkungan Gang Lang Kledong Desa Seloto Kec. Taliwang","Jenis Pekerjaan":"Lapis Penetrasi Macadam","Panjang (m)":"228.0","Lebar (m)":"3.58"},{"_id":27,"No":"27.0","Pekerjaan":"Peningkatan Jalan Lingkungan RT.04 RW.03 Lingkungan Kenangan B Kel. Arab Kenangan Kec. Taliwang","Jenis Pekerjaan":"Paving Block","Panjang (m)":"168.4","Lebar (m)":"4.3"},{"_id":28,"No":"28.0","Pekerjaan":"Peningkatan Jalan Lingkungan Kota Baru Gang II Kel. Dalam Kec. Taliwang","Jenis Pekerjaan":"Paving Block","Panjang (m)":"78.6","Lebar (m)":"3.3"},{"_id":29,"No":"29.0","Pekerjaan":"Pembangunan Jalan Lingkungan Samping Rumah Dinas Dandim Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu dan Timbunan Biasa","Panjang (m)":"89.5","Lebar (m)":"3.92"},{"_id":30,"No":"30.0","Pekerjaan":"Pembangunan Talud Pengaman Permukiman Lingk. Kota Baru Kel. Dalam Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu dan Timbunan Biasa","Panjang (m)":"104.3","Lebar (m)":"3.95"},{"_id":31,"No":"31.0","Pekerjaan":"Peningkatan Jalan Lingkungan Dusun Brang Bulu Desa Seloto Kec. Taliwang","Jenis Pekerjaan":"Paving Block","Panjang (m)":"161.0","Lebar (m)":"3.72"},{"_id":32,"No":"32.0","Pekerjaan":"Pembangunan Jalan Lingkungan Depan Pabrik Padi Denria Desa Seloto Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu dan Timbunan Pilihan Berbutir","Panjang (m)":"101.0","Lebar (m)":"3.39"},{"_id":33,"No":"33.0","Pekerjaan":"Peningkatan Jalan Lingkungan Akses Masuk TK Negeri Rora Pedi Desa Banjar Kec. Taliwang","Jenis Pekerjaan":"Paving Block","Panjang (m)":"84.0","Lebar (m)":"4.0"},{"_id":34,"No":"34.0","Pekerjaan":"Peningkatan Jalan Lingkungan RT.02 RW.04 Lingk. Muhajirin Kel. Bugis Kec. Taliwang","Jenis Pekerjaan":"Paving Block","Panjang (m)":"77.4","Lebar (m)":"4.37"},{"_id":35,"No":"35.0","Pekerjaan":"Peningkatan Jalan Lingkungan RT.08 RW.07 Lingk. Balisung Kel. Menala Kec. Taliwang","Jenis Pekerjaan":"Paving Block dan Drainase Pasangan Batu","Panjang (m)":"70.5","Lebar (m)":"5.5"},{"_id":36,"No":"36.0","Pekerjaan":"Pembangunan Jalan Lingkungan Gang VI RT.02 RW.06 Kel. Telaga Bertong Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu dan Timbunan Pilihan Berbutir","Panjang (m)":"206.0","Lebar (m)":"4.0"},{"_id":37,"No":"37.0","Pekerjaan":"Peningkatan Jalan Lingkungan Dusun Jorok Tiram Desa Banjar Kec. Taliwang","Jenis Pekerjaan":"Paving Block","Panjang (m)":"153.0","Lebar (m)":"4.2"},{"_id":38,"No":"38.0","Pekerjaan":"Pembangunan Jalan Lingkungan Tanakakan Kel. Menala Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu dan Timbunan Pilihan","Panjang (m)":"206.4","Lebar (m)":"4.0"},{"_id":39,"No":"39.0","Pekerjaan":"Peningkatan Jalan Lingkungan Gang II Kelurahan Dalam Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu, Timbunan Biasa, Timbunan Pilihan Berbutir dan Paving Block","Panjang (m)":"52.0","Lebar (m)":"5.0"},{"_id":40,"No":"40.0","Pekerjaan":"Pembangunan Jalan Lingkungan Gang III Lingkungan Perjuk Kel. Telaga Bertong Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu, Timbunan Biasa dan Timbunan Pilihan","Panjang (m)":"144.2","Lebar (m)":"3.1"},{"_id":41,"No":"41.0","Pekerjaan":"Pembangunan Jalan Lingkungan Gang I Kel. Sampir Kec. Taliwang","Jenis Pekerjaan":"Paving Block, Talud Pasangan Batu dan Timbunan Pilihan","Panjang (m)":"68.0","Lebar (m)":"4.3"},{"_id":42,"No":"42.0","Pekerjaan":"Peningkatan Jalan Lingkungan Balad Kelurahan Telaga Bertong Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu, Timbunan Biasa, Timbunan Pilihan Berbutir dan Paving Block","Panjang (m)":"173.9","Lebar (m)":"4.0"},{"_id":43,"No":"43.0","Pekerjaan":"Peningkatan Jalan Lingkungan Akses Masjid Babul Jannah - TPU Lingk. Bugis B Kel. Bugis Kec. Taliwang","Jenis Pekerjaan":"Paving Block","Panjang (m)":"131.8","Lebar (m)":"2.7"},{"_id":44,"No":"44.0","Pekerjaan":"Peningkatan Jalan Lingkungan Gang III Lingk. Kota Baru Kel. Dalam Kec. Taliwang","Jenis Pekerjaan":"Paving Block","Panjang (m)":"68.0","Lebar (m)":"3.3"},{"_id":45,"No":"45.0","Pekerjaan":"Peningkatan Jalan Lingkungan Gang Poto KTC Kec. Taliwang","Jenis Pekerjaan":"Timbunan Biasa","Panjang (m)":"205.5","Lebar (m)":"4.8"},{"_id":46,"No":"46.0","Pekerjaan":"Pembangunan Jalan Lingkungan RT.04 RW.07 Lingk. Beleong Kel. Dalam Kec. Taliwang","Jenis Pekerjaan":"Paving Block","Panjang (m)":"146.5","Lebar (m)":"3.2"},{"_id":47,"No":"47.0","Pekerjaan":"Peningkatan Jalan Lingkungan Gang III Kel. Sampir Kec. Taliwang","Jenis Pekerjaan":"Paving Block dan Talud Pasangan Batu","Panjang (m)":"212.5","Lebar (m)":"2.8"},{"_id":48,"No":"48.0","Pekerjaan":"Peningkatan Jalan Lingkungan Ai Ngero Desa Lamunga Kec. Taliwang","Jenis Pekerjaan":"Paving Block","Panjang (m)":"219.9","Lebar (m)":"2.8"},{"_id":49,"No":"49.0","Pekerjaan":"Pembangunan Jalan Lingkungan Gang Rinjani Peliuk Bage Kel. Kuang Kec. Taliwang","Jenis Pekerjaan":"Paving Block, Talud Pasangan Batu dan Timbunan Biasa","Panjang (m)":"62.0","Lebar (m)":"3.6"},{"_id":50,"No":"50.0","Pekerjaan":"Peningkatan Jalan Lingkungan RT.01 RW.09 Kel. Menala Kec. Taliwang (Lanjutan)","Jenis Pekerjaan":"Paving Block dan Talud Pasangan Batu","Panjang (m)":"156.7","Lebar (m)":"2.74"},{"_id":51,"No":"51.0","Pekerjaan":"Pembangunan Jalan Lingkungan Gang II RT.02 RW.01 Lingk. Bale Santong Kel. Kuang Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu dan Timbunan Biasa","Panjang (m)":"83.0","Lebar (m)":"4.0"},{"_id":52,"No":"52.0","Pekerjaan":"Peningkatan Jalan Lingkungan Gang Demang RT.05 RW.07 Lingkungan Batu Bele Balisung Kel. Menala Kec. Taliwang","Jenis Pekerjaan":"Paving Block","Panjang (m)":"146.9","Lebar (m)":"4.5"},{"_id":53,"No":"53.0","Pekerjaan":"Peningkatan Jalan Lingkungan Gang Doi I Lingk. Batu Bele Balisung Kel. Menala Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu, Urugan Biasa dan Paving Block","Panjang (m)":"222.0","Lebar (m)":"4.2"},{"_id":54,"No":"54.0","Pekerjaan":"Pembangunan Jalan Lingkungan Jorok Ramit Kel. Telaga Bertong Kec. Taliwang","Jenis Pekerjaan":"Jembatan Beton Bertulang, Talud Pasangan Batu, Timbunan Biasa dan Timbuna Pilihan Berbutir","Panjang (m)":"69.8","Lebar (m)":"4.0"},{"_id":55,"No":"55.0","Pekerjaan":"Pembangunan Jalan Lingkungan Keramat Gani Kel. Sampir Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu, Timbunan Biasa dan Paving Block","Panjang (m)":"53.7","Lebar (m)":"4.25"},{"_id":56,"No":"56.0","Pekerjaan":"Pembangunan Jembatan Jalan Lingkungan Kel. Telaga Bertong Kec. Taliwang","Jenis Pekerjaan":"Abutmen Pasangan Batu dan Jembatan Beton Bertulang","Panjang (m)":"7.7","Lebar (m)":"2.25"},{"_id":57,"No":"57.0","Pekerjaan":"Peningkatan Jalan Lingkungan Gang II Lingkungan Perjuk Kel. Telaga Bertong Kec. Taliwang","Jenis Pekerjaan":"Paving Block","Panjang (m)":"202.0","Lebar (m)":"3.2"},{"_id":58,"No":"58.0","Pekerjaan":"Pembangunan Jalan Lingkungan Ahlil Bait Kel. Telaga Bertong Kec. Taliwang","Jenis Pekerjaan":"Paving Block","Panjang (m)":"74.0","Lebar (m)":"4.5"},{"_id":59,"No":"59.0","Pekerjaan":"Pembangunan Jalan Lingkungan Gang Aqila Kel. Arab Kenangan Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu, Urugan Biasa dan Paving Block","Panjang (m)":"75.8","Lebar (m)":"4.5"},{"_id":60,"No":"60.0","Pekerjaan":"Pembangunan Jalan Lingkungan Gang Donodara Kel. Telaga Bertong Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu, Timbunan Biasa dan Timbunan Pilihan Berbutir","Panjang (m)":"79.7","Lebar (m)":"4.7"},{"_id":61,"No":"61.0","Pekerjaan":"Pembangunan Jalan Lingkungan Kenangan Kel. Arab Kenangan Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu, Timbunan Biasa dan Timbunan Pilihan Berbutir","Panjang (m)":"105.0","Lebar (m)":"4.0"},{"_id":62,"No":"62.0","Pekerjaan":"Pembangunan Jalan Lingkungan Nanga Tumpu Kel. Telaga Bertong Kec. Taliwang","Jenis Pekerjaan":"Talud Pasangan Batu dan Timbunan Pilihan Berbutir","Panjang (m)":"124.2","Lebar (m)":"3.7"},{"_id":63,"No":"63.0","Pekerjaan":"Peningkatan Jalan Lingkungan Dusun Roro Pedi Desa Banjar Kec. Taliwang","Jenis Pekerjaan":"Paving Block","Panjang (m)":"113.0","Lebar (m)":"5.4"},{"_id":64,"No":"64.0","Pekerjaan":"Peningkatan Jalan Lingkungan Gang Kaisar RT.03 RW.04 Lingkungan Muhajirin Kel. Bugis Kec. Taliwang","Jenis Pekerjaan":"Paving Block","Panjang (m)":"115.0","Lebar (m)":"3.0"},{"_id":65,"No":"65.0","Pekerjaan":"Peningkatan Jalan Lingkungan Gang Marcos Bentiu Kel. Dalam Kec. Taliwang","Jenis Pekerjaan":"Paving Block, Talud Pasangan Batu dan Timbunan Biasa","Panjang (m)":"127.0","Lebar (m)":"2.8"},{"_id":66,"No":"66.0","Pekerjaan":"Peningkatan Jalan Lingkungan Kota Baru Kel. Dalam (Lanjutan)","Jenis Pekerjaan":"Talud Pasangan Batu dan Timbunan Biasa","Panjang (m)":"106.7","Lebar (m)":"4.0"},{"_id":67,"No":"Total","Pekerjaan":"","Jenis Pekerjaan":"","Panjang (m)":"8876.9","Lebar (m)":"245.16"},{"_id":68,"No":"","Pekerjaan":"","Jenis Pekerjaan":"","Panjang (m)":"","Lebar (m)":""},{"_id":69,"No":"No","Pekerjaan":"Pekerjaan","Jenis Pekerjaan":"Jenis Pekerjaan","Panjang (m)":"Panjang (m)","Lebar (m)":"Lebar (m)"},{"_id":70,"No":"1.0","Pekerjaan":"Pembangunan Drainase Lingk. Gang Gajah Lingk. Menala Baru Kel. Menala Kec. Taliwang","Jenis Pekerjaan":"U Ditch","Panjang (m)":"149.0","Lebar (m)":"0.73"},{"_id":71,"No":"2.0","Pekerjaan":"Peningkatan Drainase Lingkungan Kel. Bugis Kec. Taliwang","Jenis Pekerjaan":"U Ditch dan Galian Sedimentasi","Panjang (m)":"168.0","Lebar (m)":"0.58"},{"_id":72,"No":"3.0","Pekerjaan":"Pembangunan Drainase Lingkungan RT.04 RW.01 Dusun Lamunga Bawah Desa Lamunga Kec. Taliwang","Jenis Pekerjaan":"U Ditch","Panjang (m)":"165.0","Lebar (m)":"0.45"},{"_id":73,"No":"4.0","Pekerjaan":"Peningkatan Drainase Lingkungan Gang II Kel. Bugis Kec. Taliwang","Jenis Pekerjaan":"U Ditch","Panjang (m)":"161.9","Lebar (m)":"1.0"},{"_id":74,"No":"5.0","Pekerjaan":"Peningkatan Drainase Lingkungan Jl. RA Kartini Kel. Dalam Kec. Taliwang","Jenis Pekerjaan":"Gril Penutup Saluran dan Galian Sedimentasi","Panjang (m)":"95.0","Lebar (m)":"0.79"},{"_id":75,"No":"6.0","Pekerjaan":"Pembangunan Drainase Lingkungan Lingk. Bertong B Kel. Telaga Bertong Kec. Taliwang","Jenis Pekerjaan":"Drainase Pasangan Batu","Panjang (m)":"135.1","Lebar (m)":"2.7"},{"_id":76,"No":"7.0","Pekerjaan":"Pembangunan Drainase Lingkungan Gang II Kelurahan Bugis Kec. Taliwang","Jenis Pekerjaan":"U Ditch","Panjang (m)":"55.0","Lebar (m)":"0.6"},{"_id":77,"No":"8.0","Pekerjaan":"Pembangunan Drainase Lingkungan RT.03 RW.02 Dusun Wara A Desa Labuhan Lalar Kec. Taliwang","Jenis Pekerjaan":"Drainase Pasangan Batu","Panjang (m)":"56.0","Lebar (m)":"2.4"},{"_id":78,"No":"9.0","Pekerjaan":"Peningkatan Drainase Lingkungan Batu Bele Kel. Menala Kec. Taliwang","Jenis Pekerjaan":"Drainase Pasangan Batu","Panjang (m)":"157.0","Lebar (m)":"1.6"},{"_id":79,"No":"10.0","Pekerjaan":"Pembangunan Drainase Lingkungan Jalan Bertong - Perjuk Kel. Telaga Bertong Kec. Taliwang","Jenis Pekerjaan":"Drainase Pasangan Batu","Panjang (m)":"175.5","Lebar (m)":"1.0"},{"_id":80,"No":"11.0","Pekerjaan":"Pembangunan Drainase Lingkungan Kantor Dinas Perumahan dan Permukiman","Jenis Pekerjaan":"Drainase Pasangan Batu","Panjang (m)":"98.8","Lebar (m)":"1.7"},{"_id":81,"No":"12.0","Pekerjaan":"Peningkatan Drainase Lingkungan Zona Dinas Tenaga Kerja dan Transmigrasi","Jenis Pekerjaan":"Drainase Pasangan Batu","Panjang (m)":"184.0","Lebar (m)":"1.0"},{"_id":82,"No":"Total","Pekerjaan":"","Jenis Pekerjaan":"","Panjang (m)":"1600.3","Lebar (m)":"14.549999999999999"},{"_id":83,"No":"","Pekerjaan":"","Jenis Pekerjaan":"","Panjang (m)":"","Lebar (m)":""},{"_id":84,"No":"KECAMATAN BRANG REA","Pekerjaan":"","Jenis Pekerjaan":"","Panjang (m)":"","Lebar (m)":""},{"_id":85,"No":"No","Pekerjaan":"Pekerjaan","Jenis Pekerjaan":"Jenis Pekerjaan","Panjang (m)":"Panjang (m)","Lebar (m)":"Lebar (m)"},{"_id":86,"No":"1.0","Pekerjaan":"Peningkatan Jalan Lingkungan Dusun Ketanggo Desa Lamuntet Kec. Brang Rea","Jenis Pekerjaan":"Lapisan Penetrasi Macadam dan Drainase Pasangan Batu","Panjang (m)":"185.0","Lebar (m)":"3.5"},{"_id":87,"No":"2.0","Pekerjaan":"Peningkatan Jalan Lingkungan RT.07 RW.03 Desa Seminar Salit Kec. Brang Rea","Jenis Pekerjaan":"Talud Pasangan Batu dan Timbunan Pilihan Berbutir","Panjang (m)":"85.0","Lebar (m)":"3.7"},{"_id":88,"No":"3.0","Pekerjaan":"Peningkatan Jalan Lingkungan Desa Desa Beru Kec. Brang Rea","Jenis Pekerjaan":"Talud Pasangan Batu, Timbunan Biasa, Timbunan Pilihan Berbutir dan Paving Block","Panjang (m)":"95.7","Lebar (m)":"4.0"},{"_id":89,"No":"4.0","Pekerjaan":"Pembangunan Jalan Lingkungan Desa Moteng Kec. Brang Rea","Jenis Pekerjaan":"Talud Pasangan Batu, Timbunan Biasa dan Paving Block","Panjang (m)":"66.9","Lebar (m)":"4.5"},{"_id":90,"No":"5.0","Pekerjaan":"Pembangunan Talud Pengaman Permukiman RT.12 Dusun Sepakat Desa Tepas Sepakat Kec. Brang Rea","Jenis Pekerjaan":"Talud Pasangan Batu","Panjang (m)":"99.0","Lebar (m)":"0.8"},{"_id":91,"No":"Total","Pekerjaan":"","Jenis Pekerjaan":"","Panjang (m)":"531.6","Lebar (m)":"16.5"},{"_id":92,"No":"","Pekerjaan":"","Jenis Pekerjaan":"","Panjang (m)":"","Lebar (m)":""},{"_id":93,"No":"KECAMATAN BRANG ENE","Pekerjaan":"","Jenis Pekerjaan":"","Panjang (m)":"","Lebar (m)":""},{"_id":94,"No":"No","Pekerjaan":"Pekerjaan","Jenis Pekerjaan":"Jenis Pekerjaan","Panjang (m)":"Panjang (m)","Lebar (m)":"Lebar (m)"},{"_id":95,"No":"1.0","Pekerjaan":"Peningkatan Jalan Lingkungan Yayasan Ismul Yatama Al- Hasim Desa Kalimantong Kec. Brang Ene","Jenis Pekerjaan":"Paving Block dan Drainase Pasangan Batu","Panjang (m)":"57.6","Lebar (m)":"4.8"},{"_id":96,"No":"2.0","Pekerjaan":"Peningkatan Jalan Lingkungan Samping SMK Brang Ene Kec. Brang Ene","Jenis Pekerjaan":"Talud Pasangan Batu, Timbunan Biasa dan Pilihan Timbunan Berbutir","Panjang (m)":"158.8","Lebar (m)":"4.18"},{"_id":97,"No":"3.0","Pekerjaan":"Peningkatan Jalan Lingkungan Dusun Batu Putih Desa Kalimantong Kec. Brang Ene","Jenis Pekerjaan":"Paving Block","Panjang (m)":"148.6","Lebar (m)":"3.3274091520861373"},{"_id":98,"No":"4.0","Pekerjaan":"Peningkatan Jalan Lingkungan Desa Lampok Kec. Brang Ene","Jenis Pekerjaan":"Paving Block","Panjang (m)":"308.0","Lebar (m)":"2.1"},{"_id":99,"No":"5.0","Pekerjaan":"Peningkatan Jalan Lingkungan Pebunga Desa Mujahidin Kec. Brang Ene","Jenis Pekerjaan":"Paving Block dan Drainase Pasangan Batu","Panjang (m)":"147.0","Lebar (m)":"4.0"},{"_id":100,"No":"6.0","Pekerjaan":"Peningkatan Jalan Lingkungan RT.08 RW.03 Dusun Ai Dewa Desa Kalimantong Kec. Brang Ene","Jenis Pekerjaan":"Paving Block","Panjang (m)":"205.0","Lebar (m)":"3.3"}], "fields": [{"id": "_id", "type": "int"}, {"id": "No", "type": "text"}, {"id": "Pekerjaan", "type": "text"}, {"id": "Jenis Pekerjaan", "type": "text"}, {"id": "Panjang (m)", "type": "text"}, {"id": "Lebar (m)", "type": "text"}], "_links": {"start": "/api/3/action/datastore_search?resource_id=818aa8a0-c216-4535-8243-7fc2b79316d4", "next": "/api/3/action/datastore_search?resource_id=818aa8a0-c216-4535-8243-7fc2b79316d4&offset=100"}, "total": 171, "total_was_estimated": false}}