﻿_id	No.	Tahun	Kode Wilayah	Kecamatan	Sumber Anggaran	Jumlah	Persentase (Realisasi/Rencana)
1	1	2025	2052-07-01T00:00:00	Jereweh	BSPS (APBN) Rencana	""	
2	2	2025	2052-07-01T00:00:00	Jereweh	BSPS (APBN) Realisasi	""	0
3	3	2025	2052-07-01T00:00:00	Jereweh	APBD I Rencana	""	
4	4	2025	2052-07-01T00:00:00	Jereweh	APBD I Realisasi	""	0
5	5	2025	2052-07-01T00:00:00	Jereweh	APBD II Rencana	7.0	
6	6	2025	2052-07-01T00:00:00	Jereweh	APBD II Realisasi	7.0	1
7	7	2025	2052-07-01T00:00:00	Jereweh	DAK (APBN) Rencana	""	
8	8	2025	2052-07-01T00:00:00	Jereweh	DAK (APBN) Realisasi	""	0
9	9	2025	2052-07-01T00:00:00	Jereweh	BAZNAS (CSR) Rencana	""	
10	10	2025	2052-07-01T00:00:00	Jereweh	BAZNAS (CSR) Realisasi	""	0
11	11	2025	2052-07-01T00:00:00	Jereweh	PENGEMBANG Rencana	""	
12	12	2025	2052-07-01T00:00:00	Jereweh	PENGEMBANG Realisasi	""	0
13	13	2025	2052-07-02T00:00:00	Taliwang	BSPS (APBN) Rencana	""	
14	14	2025	2052-07-02T00:00:00	Taliwang	BSPS (APBN) Realisasi	""	0
15	15	2025	2052-07-02T00:00:00	Taliwang	APBD I Rencana	""	
16	16	2025	2052-07-02T00:00:00	Taliwang	APBD I Realisasi	""	0
17	17	2025	2052-07-02T00:00:00	Taliwang	APBD II Rencana	45.0	
18	18	2025	2052-07-02T00:00:00	Taliwang	APBD II Realisasi	45.0	1
19	19	2025	2052-07-02T00:00:00	Taliwang	DAK (APBN) Rencana	""	
20	20	2025	2052-07-02T00:00:00	Taliwang	DAK (APBN) Realisasi	""	0
21	21	2025	2052-07-02T00:00:00	Taliwang	BAZNAS (CSR) Rencana	""	
22	22	2025	2052-07-02T00:00:00	Taliwang	BAZNAS (CSR) Realisasi	""	0
23	23	2025	2052-07-02T00:00:00	Taliwang	PENGEMBANG Rencana	""	
24	24	2025	2052-07-02T00:00:00	Taliwang	PENGEMBANG Realisasi	""	0
25	25	2025	2052-07-03T00:00:00	Seteluk	BSPS (APBN) Rencana	""	
26	26	2025	2052-07-03T00:00:00	Seteluk	BSPS (APBN) Realisasi	""	0
27	27	2025	2052-07-03T00:00:00	Seteluk	APBD I Rencana	""	
28	28	2025	2052-07-03T00:00:00	Seteluk	APBD I Realisasi	""	0
29	29	2025	2052-07-03T00:00:00	Seteluk	APBD II Rencana	21.0	
30	30	2025	2052-07-03T00:00:00	Seteluk	APBD II Realisasi	21.0	1
31	31	2025	2052-07-03T00:00:00	Seteluk	DAK (APBN) Rencana	""	
32	32	2025	2052-07-03T00:00:00	Seteluk	DAK (APBN) Realisasi	""	0
33	33	2025	2052-07-03T00:00:00	Seteluk	BAZNAS (CSR) Rencana	""	
34	34	2025	2052-07-03T00:00:00	Seteluk	BAZNAS (CSR) Realisasi	""	0
35	35	2025	2052-07-03T00:00:00	Seteluk	PENGEMBANG Rencana	""	
36	36	2025	2052-07-03T00:00:00	Seteluk	PENGEMBANG Realisasi	""	0
37	37	2025	2052-07-04T00:00:00	Sekongkang	BSPS (APBN) Rencana	""	
38	38	2025	2052-07-04T00:00:00	Sekongkang	BSPS (APBN) Realisasi	""	0
39	39	2025	2052-07-04T00:00:00	Sekongkang	APBD I Rencana	""	
40	40	2025	2052-07-04T00:00:00	Sekongkang	APBD I Realisasi	""	0
41	41	2025	2052-07-04T00:00:00	Sekongkang	APBD II Rencana	5.0	
42	42	2025	2052-07-04T00:00:00	Sekongkang	APBD II Realisasi	5.0	1
43	43	2025	2052-07-04T00:00:00	Sekongkang	DAK (APBN) Rencana	""	
44	44	2025	2052-07-04T00:00:00	Sekongkang	DAK (APBN) Realisasi	""	0
45	45	2025	2052-07-04T00:00:00	Sekongkang	BAZNAS (CSR) Rencana	""	
46	46	2025	2052-07-04T00:00:00	Sekongkang	BAZNAS (CSR) Realisasi	""	0
47	47	2025	2052-07-04T00:00:00	Sekongkang	PENGEMBANG Rencana	""	
48	48	2025	2052-07-04T00:00:00	Sekongkang	PENGEMBANG Realisasi	""	0
49	49	2025	2052-07-05T00:00:00	Brang Rea	BSPS (APBN) Rencana	""	
50	50	2025	2052-07-05T00:00:00	Brang Rea	BSPS (APBN) Realisasi	""	0
51	51	2025	2052-07-05T00:00:00	Brang Rea	APBD I Rencana	""	
52	52	2025	2052-07-05T00:00:00	Brang Rea	APBD I Realisasi	""	0
53	53	2025	2052-07-05T00:00:00	Brang Rea	APBD II Rencana	7.0	
54	54	2025	2052-07-05T00:00:00	Brang Rea	APBD II Realisasi	6.0	0.85714285714285709527615608749329112470149993896484375
55	55	2025	2052-07-05T00:00:00	Brang Rea	DAK (APBN) Rencana	""	
56	56	2025	2052-07-05T00:00:00	Brang Rea	DAK (APBN) Realisasi	""	0
57	57	2025	2052-07-05T00:00:00	Brang Rea	BAZNAS (CSR) Rencana	""	
58	58	2025	2052-07-05T00:00:00	Brang Rea	BAZNAS (CSR) Realisasi	""	0
59	59	2025	2052-07-05T00:00:00	Brang Rea	PENGEMBANG Rencana	""	
60	60	2025	2052-07-05T00:00:00	Brang Rea	PENGEMBANG Realisasi	""	0
61	61	2025	2052-07-06T00:00:00	Poto Tano	BSPS (APBN) Rencana	""	
62	62	2025	2052-07-06T00:00:00	Poto Tano	BSPS (APBN) Realisasi	""	0
63	63	2025	2052-07-06T00:00:00	Poto Tano	APBD I Rencana	""	
64	64	2025	2052-07-06T00:00:00	Poto Tano	APBD I Realisasi	""	0
65	65	2025	2052-07-06T00:00:00	Poto Tano	APBD II Rencana	8.0	
66	66	2025	2052-07-06T00:00:00	Poto Tano	APBD II Realisasi	8.0	1
67	67	2025	2052-07-06T00:00:00	Poto Tano	DAK (APBN) Rencana	""	
68	68	2025	2052-07-06T00:00:00	Poto Tano	DAK (APBN) Realisasi	""	0
69	69	2025	2052-07-06T00:00:00	Poto Tano	BAZNAS (CSR) Rencana	""	
70	70	2025	2052-07-06T00:00:00	Poto Tano	BAZNAS (CSR) Realisasi	""	0
71	71	2025	2052-07-06T00:00:00	Poto Tano	PENGEMBANG Rencana	""	
72	72	2025	2052-07-06T00:00:00	Poto Tano	PENGEMBANG Realisasi	""	0
73	73	2025	2052-07-07T00:00:00	Brang Ene	BSPS (APBN) Rencana	""	
74	74	2025	2052-07-07T00:00:00	Brang Ene	BSPS (APBN) Realisasi	""	0
75	75	2025	2052-07-07T00:00:00	Brang Ene	APBD I Rencana	""	
76	76	2025	2052-07-07T00:00:00	Brang Ene	APBD I Realisasi	""	0
77	77	2025	2052-07-07T00:00:00	Brang Ene	APBD II Rencana	7.0	
78	78	2025	2052-07-07T00:00:00	Brang Ene	APBD II Realisasi	7.0	1
79	79	2025	2052-07-07T00:00:00	Brang Ene	DAK (APBN) Rencana	""	
80	80	2025	2052-07-07T00:00:00	Brang Ene	DAK (APBN) Realisasi	""	0
81	81	2025	2052-07-07T00:00:00	Brang Ene	BAZNAS (CSR) Rencana	""	
82	82	2025	2052-07-07T00:00:00	Brang Ene	BAZNAS (CSR) Realisasi	""	0
83	83	2025	2052-07-07T00:00:00	Brang Ene	PENGEMBANG Rencana	""	
84	84	2025	2052-07-07T00:00:00	Brang Ene	PENGEMBANG Realisasi	""	0
85	85	2025	2052-07-08T00:00:00	Maluk	BSPS (APBN) Rencana	""	
86	86	2025	2052-07-08T00:00:00	Maluk	BSPS (APBN) Realisasi	""	0
87	87	2025	2052-07-08T00:00:00	Maluk	APBD I Rencana	""	
88	88	2025	2052-07-08T00:00:00	Maluk	APBD I Realisasi	""	0
89	89	2025	2052-07-08T00:00:00	Maluk	APBD II Rencana	7.0	
90	90	2025	2052-07-08T00:00:00	Maluk	APBD II Realisasi	7.0	1
91	91	2025	2052-07-08T00:00:00	Maluk	DAK (APBN) Rencana	""	
92	92	2025	2052-07-08T00:00:00	Maluk	DAK (APBN) Realisasi	""	0
93	93	2025	2052-07-08T00:00:00	Maluk	BAZNAS (CSR) Rencana	""	
94	94	2025	2052-07-08T00:00:00	Maluk	BAZNAS (CSR) Realisasi	""	0
95	95	2025	2052-07-08T00:00:00	Maluk	PENGEMBANG Rencana	""	
96	96	2025	2052-07-08T00:00:00	Maluk	PENGEMBANG Realisasi	""	0
97	97	2024	2052-07-01T00:00:00	Jereweh	BSPS (APBN) Rencana	""	
98	98	2024	2052-07-01T00:00:00	Jereweh	BSPS (APBN) Realisasi	""	0
99	99	2024	2052-07-01T00:00:00	Jereweh	APBD I Rencana	""	
100	100	2024	2052-07-01T00:00:00	Jereweh	APBD I Realisasi	""	0
101	101	2024	2052-07-01T00:00:00	Jereweh	APBD II Rencana	5.0	
102	102	2024	2052-07-01T00:00:00	Jereweh	APBD II Realisasi	5.0	1
103	103	2024	2052-07-01T00:00:00	Jereweh	DAK (APBN) Rencana	""	
104	104	2024	2052-07-01T00:00:00	Jereweh	DAK (APBN) Realisasi	""	0
105	105	2024	2052-07-01T00:00:00	Jereweh	BAZNAS (CSR) Rencana	""	
106	106	2024	2052-07-01T00:00:00	Jereweh	BAZNAS (CSR) Realisasi	""	0
107	107	2024	2052-07-01T00:00:00	Jereweh	PENGEMBANG Rencana	""	
108	108	2024	2052-07-01T00:00:00	Jereweh	PENGEMBANG Realisasi	""	0
109	109	2024	2052-07-02T00:00:00	Taliwang	BSPS (APBN) Rencana	""	
110	110	2024	2052-07-02T00:00:00	Taliwang	BSPS (APBN) Realisasi	""	0
111	111	2024	2052-07-02T00:00:00	Taliwang	APBD I Rencana	""	
112	112	2024	2052-07-02T00:00:00	Taliwang	APBD I Realisasi	""	0
113	113	2024	2052-07-02T00:00:00	Taliwang	APBD II Rencana	29.0	
114	114	2024	2052-07-02T00:00:00	Taliwang	APBD II Realisasi	29.0	1
115	115	2024	2052-07-02T00:00:00	Taliwang	DAK (APBN) Rencana	""	
116	116	2024	2052-07-02T00:00:00	Taliwang	DAK (APBN) Realisasi	""	0
117	117	2024	2052-07-02T00:00:00	Taliwang	BAZNAS (CSR) Rencana	""	
118	118	2024	2052-07-02T00:00:00	Taliwang	BAZNAS (CSR) Realisasi	""	0
119	119	2024	2052-07-02T00:00:00	Taliwang	PENGEMBANG Rencana	""	
120	120	2024	2052-07-02T00:00:00	Taliwang	PENGEMBANG Realisasi	""	0
121	121	2024	2052-07-03T00:00:00	Seteluk	BSPS (APBN) Rencana	""	
122	122	2024	2052-07-03T00:00:00	Seteluk	BSPS (APBN) Realisasi	""	0
123	123	2024	2052-07-03T00:00:00	Seteluk	APBD I Rencana	""	
124	124	2024	2052-07-03T00:00:00	Seteluk	APBD I Realisasi	""	0
125	125	2024	2052-07-03T00:00:00	Seteluk	APBD II Rencana	10.0	
126	126	2024	2052-07-03T00:00:00	Seteluk	APBD II Realisasi	10.0	1
127	127	2024	2052-07-03T00:00:00	Seteluk	DAK (APBN) Rencana	""	
128	128	2024	2052-07-03T00:00:00	Seteluk	DAK (APBN) Realisasi	""	0
129	129	2024	2052-07-03T00:00:00	Seteluk	BAZNAS (CSR) Rencana	""	
130	130	2024	2052-07-03T00:00:00	Seteluk	BAZNAS (CSR) Realisasi	""	0
131	131	2024	2052-07-03T00:00:00	Seteluk	PENGEMBANG Rencana	""	
132	132	2024	2052-07-03T00:00:00	Seteluk	PENGEMBANG Realisasi	""	0
133	133	2024	2052-07-04T00:00:00	Sekongkang	BSPS (APBN) Rencana	""	
134	134	2024	2052-07-04T00:00:00	Sekongkang	BSPS (APBN) Realisasi	""	0
135	135	2024	2052-07-04T00:00:00	Sekongkang	APBD I Rencana	""	
136	136	2024	2052-07-04T00:00:00	Sekongkang	APBD I Realisasi	""	0
137	137	2024	2052-07-04T00:00:00	Sekongkang	APBD II Rencana	-	
138	138	2024	2052-07-04T00:00:00	Sekongkang	APBD II Realisasi	-	0
139	139	2024	2052-07-04T00:00:00	Sekongkang	DAK (APBN) Rencana	""	
140	140	2024	2052-07-04T00:00:00	Sekongkang	DAK (APBN) Realisasi	""	0
141	141	2024	2052-07-04T00:00:00	Sekongkang	BAZNAS (CSR) Rencana	""	
142	142	2024	2052-07-04T00:00:00	Sekongkang	BAZNAS (CSR) Realisasi	""	0
143	143	2024	2052-07-04T00:00:00	Sekongkang	PENGEMBANG Rencana	""	
144	144	2024	2052-07-04T00:00:00	Sekongkang	PENGEMBANG Realisasi	""	0
145	145	2024	2052-07-05T00:00:00	Brang Rea	BSPS (APBN) Rencana	""	
146	146	2024	2052-07-05T00:00:00	Brang Rea	BSPS (APBN) Realisasi	""	0
147	147	2024	2052-07-05T00:00:00	Brang Rea	APBD I Rencana	""	
148	148	2024	2052-07-05T00:00:00	Brang Rea	APBD I Realisasi	""	0
149	149	2024	2052-07-05T00:00:00	Brang Rea	APBD II Rencana	10.0	
150	150	2024	2052-07-05T00:00:00	Brang Rea	APBD II Realisasi	10.0	1
151	151	2024	2052-07-05T00:00:00	Brang Rea	DAK (APBN) Rencana	""	
152	152	2024	2052-07-05T00:00:00	Brang Rea	DAK (APBN) Realisasi	""	0
153	153	2024	2052-07-05T00:00:00	Brang Rea	BAZNAS (CSR) Rencana	""	
154	154	2024	2052-07-05T00:00:00	Brang Rea	BAZNAS (CSR) Realisasi	""	0
155	155	2024	2052-07-05T00:00:00	Brang Rea	PENGEMBANG Rencana	""	
156	156	2024	2052-07-05T00:00:00	Brang Rea	PENGEMBANG Realisasi	""	0
157	157	2024	2052-07-06T00:00:00	Poto Tano	BSPS (APBN) Rencana	""	
158	158	2024	2052-07-06T00:00:00	Poto Tano	BSPS (APBN) Realisasi	""	0
159	159	2024	2052-07-06T00:00:00	Poto Tano	APBD I Rencana	""	
160	160	2024	2052-07-06T00:00:00	Poto Tano	APBD I Realisasi	""	0
161	161	2024	2052-07-06T00:00:00	Poto Tano	APBD II Rencana	8.0	
162	162	2024	2052-07-06T00:00:00	Poto Tano	APBD II Realisasi	8.0	1
163	163	2024	2052-07-06T00:00:00	Poto Tano	DAK (APBN) Rencana	""	
164	164	2024	2052-07-06T00:00:00	Poto Tano	DAK (APBN) Realisasi	""	0
165	165	2024	2052-07-06T00:00:00	Poto Tano	BAZNAS (CSR) Rencana	""	
166	166	2024	2052-07-06T00:00:00	Poto Tano	BAZNAS (CSR) Realisasi	""	0
167	167	2024	2052-07-06T00:00:00	Poto Tano	PENGEMBANG Rencana	""	
168	168	2024	2052-07-06T00:00:00	Poto Tano	PENGEMBANG Realisasi	""	0
169	169	2024	2052-07-07T00:00:00	Brang Ene	BSPS (APBN) Rencana	""	
170	170	2024	2052-07-07T00:00:00	Brang Ene	BSPS (APBN) Realisasi	""	0
171	171	2024	2052-07-07T00:00:00	Brang Ene	APBD I Rencana	""	
172	172	2024	2052-07-07T00:00:00	Brang Ene	APBD I Realisasi	""	0
173	173	2024	2052-07-07T00:00:00	Brang Ene	APBD II Rencana	3.0	
174	174	2024	2052-07-07T00:00:00	Brang Ene	APBD II Realisasi	3.0	1
175	175	2024	2052-07-07T00:00:00	Brang Ene	DAK (APBN) Rencana	""	
176	176	2024	2052-07-07T00:00:00	Brang Ene	DAK (APBN) Realisasi	""	0
177	177	2024	2052-07-07T00:00:00	Brang Ene	BAZNAS (CSR) Rencana	""	
178	178	2024	2052-07-07T00:00:00	Brang Ene	BAZNAS (CSR) Realisasi	""	0
179	179	2024	2052-07-07T00:00:00	Brang Ene	PENGEMBANG Rencana	""	
180	180	2024	2052-07-07T00:00:00	Brang Ene	PENGEMBANG Realisasi	""	0
181	181	2024	2052-07-08T00:00:00	Maluk	BSPS (APBN) Rencana	""	
182	182	2024	2052-07-08T00:00:00	Maluk	BSPS (APBN) Realisasi	""	0
183	183	2024	2052-07-08T00:00:00	Maluk	APBD I Rencana	""	
184	184	2024	2052-07-08T00:00:00	Maluk	APBD I Realisasi	""	0
185	185	2024	2052-07-08T00:00:00	Maluk	APBD II Rencana	2.0	
186	186	2024	2052-07-08T00:00:00	Maluk	APBD II Realisasi	2.0	1
187	187	2024	2052-07-08T00:00:00	Maluk	DAK (APBN) Rencana	""	
188	188	2024	2052-07-08T00:00:00	Maluk	DAK (APBN) Realisasi	""	0
189	189	2024	2052-07-08T00:00:00	Maluk	BAZNAS (CSR) Rencana	""	
190	190	2024	2052-07-08T00:00:00	Maluk	BAZNAS (CSR) Realisasi	""	0
191	191	2024	2052-07-08T00:00:00	Maluk	PENGEMBANG Rencana	""	
192	192	2024	2052-07-08T00:00:00	Maluk	PENGEMBANG Realisasi	""	0
193	193	2023	2052-07-01T00:00:00	Jereweh	BSPS (APBN) Rencana	""	
194	194	2023	2052-07-01T00:00:00	Jereweh	BSPS (APBN) Realisasi	""	0
195	195	2023	2052-07-01T00:00:00	Jereweh	APBD I Rencana	""	
196	196	2023	2052-07-01T00:00:00	Jereweh	APBD I Realisasi	""	0
197	197	2023	2052-07-01T00:00:00	Jereweh	APBD II Rencana	15.0	
198	198	2023	2052-07-01T00:00:00	Jereweh	APBD II Realisasi	15.0	1
199	199	2023	2052-07-01T00:00:00	Jereweh	DAK (APBN) Rencana	""	
200	200	2023	2052-07-01T00:00:00	Jereweh	DAK (APBN) Realisasi	""	0
201	201	2023	2052-07-01T00:00:00	Jereweh	BAZNAS (CSR) Rencana	""	
202	202	2023	2052-07-01T00:00:00	Jereweh	BAZNAS (CSR) Realisasi	""	0
203	203	2023	2052-07-01T00:00:00	Jereweh	PENGEMBANG Rencana	""	
204	204	2023	2052-07-01T00:00:00	Jereweh	PENGEMBANG Realisasi	""	0
205	205	2023	2052-07-02T00:00:00	Taliwang	BSPS (APBN) Rencana	""	
206	206	2023	2052-07-02T00:00:00	Taliwang	BSPS (APBN) Realisasi	""	0
207	207	2023	2052-07-02T00:00:00	Taliwang	APBD I Rencana	""	
208	208	2023	2052-07-02T00:00:00	Taliwang	APBD I Realisasi	""	0
209	209	2023	2052-07-02T00:00:00	Taliwang	APBD II Rencana	110.0	
210	210	2023	2052-07-02T00:00:00	Taliwang	APBD II Realisasi	110.0	1
211	211	2023	2052-07-02T00:00:00	Taliwang	DAK (APBN) Rencana	""	
212	212	2023	2052-07-02T00:00:00	Taliwang	DAK (APBN) Realisasi	""	0
213	213	2023	2052-07-02T00:00:00	Taliwang	BAZNAS (CSR) Rencana	""	
214	214	2023	2052-07-02T00:00:00	Taliwang	BAZNAS (CSR) Realisasi	""	0
215	215	2023	2052-07-02T00:00:00	Taliwang	PENGEMBANG Rencana	""	
216	216	2023	2052-07-02T00:00:00	Taliwang	PENGEMBANG Realisasi	""	0
217	217	2023	2052-07-03T00:00:00	Seteluk	BSPS (APBN) Rencana	""	
218	218	2023	2052-07-03T00:00:00	Seteluk	BSPS (APBN) Realisasi	""	0
219	219	2023	2052-07-03T00:00:00	Seteluk	APBD I Rencana	""	
220	220	2023	2052-07-03T00:00:00	Seteluk	APBD I Realisasi	""	0
221	221	2023	2052-07-03T00:00:00	Seteluk	APBD II Rencana	19.0	
222	222	2023	2052-07-03T00:00:00	Seteluk	APBD II Realisasi	19.0	1
223	223	2023	2052-07-03T00:00:00	Seteluk	DAK (APBN) Rencana	""	
224	224	2023	2052-07-03T00:00:00	Seteluk	DAK (APBN) Realisasi	""	0
225	225	2023	2052-07-03T00:00:00	Seteluk	BAZNAS (CSR) Rencana	""	
226	226	2023	2052-07-03T00:00:00	Seteluk	BAZNAS (CSR) Realisasi	""	0
227	227	2023	2052-07-03T00:00:00	Seteluk	PENGEMBANG Rencana	""	
228	228	2023	2052-07-03T00:00:00	Seteluk	PENGEMBANG Realisasi	""	0
229	229	2023	2052-07-04T00:00:00	Sekongkang	BSPS (APBN) Rencana	""	
230	230	2023	2052-07-04T00:00:00	Sekongkang	BSPS (APBN) Realisasi	""	0
231	231	2023	2052-07-04T00:00:00	Sekongkang	APBD I Rencana	""	
232	232	2023	2052-07-04T00:00:00	Sekongkang	APBD I Realisasi	""	0
233	233	2023	2052-07-04T00:00:00	Sekongkang	APBD II Rencana	47.0	
234	234	2023	2052-07-04T00:00:00	Sekongkang	APBD II Realisasi	47.0	1
235	235	2023	2052-07-04T00:00:00	Sekongkang	DAK (APBN) Rencana	""	
236	236	2023	2052-07-04T00:00:00	Sekongkang	DAK (APBN) Realisasi	""	0
237	237	2023	2052-07-04T00:00:00	Sekongkang	BAZNAS (CSR) Rencana	""	
238	238	2023	2052-07-04T00:00:00	Sekongkang	BAZNAS (CSR) Realisasi	""	0
239	239	2023	2052-07-04T00:00:00	Sekongkang	PENGEMBANG Rencana	""	
240	240	2023	2052-07-04T00:00:00	Sekongkang	PENGEMBANG Realisasi	""	0
241	241	2023	2052-07-05T00:00:00	Brang Rea	BSPS (APBN) Rencana	18.0	
242	242	2023	2052-07-05T00:00:00	Brang Rea	BSPS (APBN) Realisasi	18.0	1
243	243	2023	2052-07-05T00:00:00	Brang Rea	APBD I Rencana	""	
244	244	2023	2052-07-05T00:00:00	Brang Rea	APBD I Realisasi	""	0
245	245	2023	2052-07-05T00:00:00	Brang Rea	APBD II Rencana	21.0	
246	246	2023	2052-07-05T00:00:00	Brang Rea	APBD II Realisasi	21.0	1
247	247	2023	2052-07-05T00:00:00	Brang Rea	DAK (APBN) Rencana	""	
248	248	2023	2052-07-05T00:00:00	Brang Rea	DAK (APBN) Realisasi	""	0
249	249	2023	2052-07-05T00:00:00	Brang Rea	BAZNAS (CSR) Rencana	""	
250	250	2023	2052-07-05T00:00:00	Brang Rea	BAZNAS (CSR) Realisasi	""	0
251	251	2023	2052-07-05T00:00:00	Brang Rea	PENGEMBANG Rencana	""	
252	252	2023	2052-07-05T00:00:00	Brang Rea	PENGEMBANG Realisasi	""	0
253	253	2023	2052-07-06T00:00:00	Poto Tano	BSPS (APBN) Rencana	""	
254	254	2023	2052-07-06T00:00:00	Poto Tano	BSPS (APBN) Realisasi	""	0
255	255	2023	2052-07-06T00:00:00	Poto Tano	APBD I Rencana	""	
256	256	2023	2052-07-06T00:00:00	Poto Tano	APBD I Realisasi	""	0
257	257	2023	2052-07-06T00:00:00	Poto Tano	APBD II Rencana	12.0	
258	258	2023	2052-07-06T00:00:00	Poto Tano	APBD II Realisasi	12.0	1
259	259	2023	2052-07-06T00:00:00	Poto Tano	DAK (APBN) Rencana	""	
260	260	2023	2052-07-06T00:00:00	Poto Tano	DAK (APBN) Realisasi	""	0
261	261	2023	2052-07-06T00:00:00	Poto Tano	BAZNAS (CSR) Rencana	""	
262	262	2023	2052-07-06T00:00:00	Poto Tano	BAZNAS (CSR) Realisasi	""	0
263	263	2023	2052-07-06T00:00:00	Poto Tano	PENGEMBANG Rencana	""	
264	264	2023	2052-07-06T00:00:00	Poto Tano	PENGEMBANG Realisasi	""	0
265	265	2023	2052-07-07T00:00:00	Brang Ene	BSPS (APBN) Rencana	""	
266	266	2023	2052-07-07T00:00:00	Brang Ene	BSPS (APBN) Realisasi	""	0
267	267	2023	2052-07-07T00:00:00	Brang Ene	APBD I Rencana	""	
268	268	2023	2052-07-07T00:00:00	Brang Ene	APBD I Realisasi	""	0
269	269	2023	2052-07-07T00:00:00	Brang Ene	APBD II Rencana	8.0	
270	270	2023	2052-07-07T00:00:00	Brang Ene	APBD II Realisasi	8.0	1
271	271	2023	2052-07-07T00:00:00	Brang Ene	DAK (APBN) Rencana	""	
272	272	2023	2052-07-07T00:00:00	Brang Ene	DAK (APBN) Realisasi	""	0
273	273	2023	2052-07-07T00:00:00	Brang Ene	BAZNAS (CSR) Rencana	""	
274	274	2023	2052-07-07T00:00:00	Brang Ene	BAZNAS (CSR) Realisasi	""	0
275	275	2023	2052-07-07T00:00:00	Brang Ene	PENGEMBANG Rencana	""	
276	276	2023	2052-07-07T00:00:00	Brang Ene	PENGEMBANG Realisasi	""	0
277	277	2023	2052-07-08T00:00:00	Maluk	BSPS (APBN) Rencana	""	
278	278	2023	2052-07-08T00:00:00	Maluk	BSPS (APBN) Realisasi	""	0
279	279	2023	2052-07-08T00:00:00	Maluk	APBD I Rencana	""	
280	280	2023	2052-07-08T00:00:00	Maluk	APBD I Realisasi	""	0
281	281	2023	2052-07-08T00:00:00	Maluk	APBD II Rencana	7.0	
282	282	2023	2052-07-08T00:00:00	Maluk	APBD II Realisasi	7.0	1
283	283	2023	2052-07-08T00:00:00	Maluk	DAK (APBN) Rencana	""	
284	284	2023	2052-07-08T00:00:00	Maluk	DAK (APBN) Realisasi	""	0
285	285	2023	2052-07-08T00:00:00	Maluk	BAZNAS (CSR) Rencana	""	
286	286	2023	2052-07-08T00:00:00	Maluk	BAZNAS (CSR) Realisasi	""	0
287	287	2023	2052-07-08T00:00:00	Maluk	PENGEMBANG Rencana	""	
288	288	2023	2052-07-08T00:00:00	Maluk	PENGEMBANG Realisasi	""	0
289	289	2022	2052-07-01T00:00:00	Jereweh	BSPS (APBN) Rencana	0.0	
290	290	2022	2052-07-01T00:00:00	Jereweh	BSPS (APBN) Realisasi	0.0	0
291	291	2022	2052-07-01T00:00:00	Jereweh	APBD I Rencana	""	
292	292	2022	2052-07-01T00:00:00	Jereweh	APBD I Realisasi	""	0
293	293	2022	2052-07-01T00:00:00	Jereweh	APBD II Rencana	3.0	
294	294	2022	2052-07-01T00:00:00	Jereweh	APBD II Realisasi	3.0	1
295	295	2022	2052-07-01T00:00:00	Jereweh	DAK (APBN) Rencana	""	
296	296	2022	2052-07-01T00:00:00	Jereweh	DAK (APBN) Realisasi	""	0
297	297	2022	2052-07-01T00:00:00	Jereweh	BAZNAS (CSR) Rencana	""	
298	298	2022	2052-07-01T00:00:00	Jereweh	BAZNAS (CSR) Realisasi	""	0
299	299	2022	2052-07-01T00:00:00	Jereweh	PENGEMBANG Rencana	""	
300	300	2022	2052-07-01T00:00:00	Jereweh	PENGEMBANG Realisasi	""	0
301	301	2022	2052-07-02T00:00:00	Taliwang	BSPS (APBN) Rencana	49.0	
302	302	2022	2052-07-02T00:00:00	Taliwang	BSPS (APBN) Realisasi	49.0	1
303	303	2022	2052-07-02T00:00:00	Taliwang	APBD I Rencana	""	
304	304	2022	2052-07-02T00:00:00	Taliwang	APBD I Realisasi	""	0
305	305	2022	2052-07-02T00:00:00	Taliwang	APBD II Rencana	12.0	
306	306	2022	2052-07-02T00:00:00	Taliwang	APBD II Realisasi	12.0	1
307	307	2022	2052-07-02T00:00:00	Taliwang	DAK (APBN) Rencana	50.0	
308	308	2022	2052-07-02T00:00:00	Taliwang	DAK (APBN) Realisasi	50.0	1
309	309	2022	2052-07-02T00:00:00	Taliwang	BAZNAS (CSR) Rencana	""	
310	310	2022	2052-07-02T00:00:00	Taliwang	BAZNAS (CSR) Realisasi	""	0
311	311	2022	2052-07-02T00:00:00	Taliwang	PENGEMBANG Rencana	""	
312	312	2022	2052-07-02T00:00:00	Taliwang	PENGEMBANG Realisasi	""	0
313	313	2022	2052-07-03T00:00:00	Seteluk	BSPS (APBN) Rencana	107.0	
314	314	2022	2052-07-03T00:00:00	Seteluk	BSPS (APBN) Realisasi	107.0	1
315	315	2022	2052-07-03T00:00:00	Seteluk	APBD I Rencana	""	
316	316	2022	2052-07-03T00:00:00	Seteluk	APBD I Realisasi	""	0
317	317	2022	2052-07-03T00:00:00	Seteluk	APBD II Rencana	3.0	
318	318	2022	2052-07-03T00:00:00	Seteluk	APBD II Realisasi	3.0	1
319	319	2022	2052-07-03T00:00:00	Seteluk	DAK (APBN) Rencana	""	
320	320	2022	2052-07-03T00:00:00	Seteluk	DAK (APBN) Realisasi	""	0
321	321	2022	2052-07-03T00:00:00	Seteluk	BAZNAS (CSR) Rencana	""	
322	322	2022	2052-07-03T00:00:00	Seteluk	BAZNAS (CSR) Realisasi	""	0
323	323	2022	2052-07-03T00:00:00	Seteluk	PENGEMBANG Rencana	""	
324	324	2022	2052-07-03T00:00:00	Seteluk	PENGEMBANG Realisasi	""	0
325	325	2022	2052-07-04T00:00:00	Sekongkang	BSPS (APBN) Rencana	0.0	
326	326	2022	2052-07-04T00:00:00	Sekongkang	BSPS (APBN) Realisasi	0.0	0
327	327	2022	2052-07-04T00:00:00	Sekongkang	APBD I Rencana	""	
328	328	2022	2052-07-04T00:00:00	Sekongkang	APBD I Realisasi	""	0
329	329	2022	2052-07-04T00:00:00	Sekongkang	APBD II Rencana	0.0	
330	330	2022	2052-07-04T00:00:00	Sekongkang	APBD II Realisasi	0.0	0
331	331	2022	2052-07-04T00:00:00	Sekongkang	DAK (APBN) Rencana	""	
332	332	2022	2052-07-04T00:00:00	Sekongkang	DAK (APBN) Realisasi	""	0
333	333	2022	2052-07-04T00:00:00	Sekongkang	BAZNAS (CSR) Rencana	""	
334	334	2022	2052-07-04T00:00:00	Sekongkang	BAZNAS (CSR) Realisasi	""	0
335	335	2022	2052-07-04T00:00:00	Sekongkang	PENGEMBANG Rencana	""	
336	336	2022	2052-07-04T00:00:00	Sekongkang	PENGEMBANG Realisasi	""	0
337	337	2022	2052-07-05T00:00:00	Brang Rea	BSPS (APBN) Rencana	133.0	
338	338	2022	2052-07-05T00:00:00	Brang Rea	BSPS (APBN) Realisasi	133.0	1
339	339	2022	2052-07-05T00:00:00	Brang Rea	APBD I Rencana	""	
340	340	2022	2052-07-05T00:00:00	Brang Rea	APBD I Realisasi	""	0
341	341	2022	2052-07-05T00:00:00	Brang Rea	APBD II Rencana	4.0	
342	342	2022	2052-07-05T00:00:00	Brang Rea	APBD II Realisasi	4.0	1
343	343	2022	2052-07-05T00:00:00	Brang Rea	DAK (APBN) Rencana	""	
344	344	2022	2052-07-05T00:00:00	Brang Rea	DAK (APBN) Realisasi	""	0
345	345	2022	2052-07-05T00:00:00	Brang Rea	BAZNAS (CSR) Rencana	""	
346	346	2022	2052-07-05T00:00:00	Brang Rea	BAZNAS (CSR) Realisasi	""	0
347	347	2022	2052-07-05T00:00:00	Brang Rea	PENGEMBANG Rencana	""	
348	348	2022	2052-07-05T00:00:00	Brang Rea	PENGEMBANG Realisasi	""	0
349	349	2022	2052-07-06T00:00:00	Poto Tano	BSPS (APBN) Rencana	174.0	
350	350	2022	2052-07-06T00:00:00	Poto Tano	BSPS (APBN) Realisasi	174.0	1
351	351	2022	2052-07-06T00:00:00	Poto Tano	APBD I Rencana	""	
352	352	2022	2052-07-06T00:00:00	Poto Tano	APBD I Realisasi	""	0
353	353	2022	2052-07-06T00:00:00	Poto Tano	APBD II Rencana	2.0	
354	354	2022	2052-07-06T00:00:00	Poto Tano	APBD II Realisasi	2.0	1
355	355	2022	2052-07-06T00:00:00	Poto Tano	DAK (APBN) Rencana	""	
356	356	2022	2052-07-06T00:00:00	Poto Tano	DAK (APBN) Realisasi	""	0
357	357	2022	2052-07-06T00:00:00	Poto Tano	BAZNAS (CSR) Rencana	""	
358	358	2022	2052-07-06T00:00:00	Poto Tano	BAZNAS (CSR) Realisasi	""	0
359	359	2022	2052-07-06T00:00:00	Poto Tano	PENGEMBANG Rencana	""	
360	360	2022	2052-07-06T00:00:00	Poto Tano	PENGEMBANG Realisasi	""	0
361	361	2022	2052-07-07T00:00:00	Brang Ene	BSPS (APBN) Rencana	0.0	
362	362	2022	2052-07-07T00:00:00	Brang Ene	BSPS (APBN) Realisasi	0.0	0
363	363	2022	2052-07-07T00:00:00	Brang Ene	APBD I Rencana	""	
364	364	2022	2052-07-07T00:00:00	Brang Ene	APBD I Realisasi	""	0
365	365	2022	2052-07-07T00:00:00	Brang Ene	APBD II Rencana	1.0	
366	366	2022	2052-07-07T00:00:00	Brang Ene	APBD II Realisasi	1.0	1
367	367	2022	2052-07-07T00:00:00	Brang Ene	DAK (APBN) Rencana	""	
368	368	2022	2052-07-07T00:00:00	Brang Ene	DAK (APBN) Realisasi	""	0
369	369	2022	2052-07-07T00:00:00	Brang Ene	BAZNAS (CSR) Rencana	""	
370	370	2022	2052-07-07T00:00:00	Brang Ene	BAZNAS (CSR) Realisasi	""	0
371	371	2022	2052-07-07T00:00:00	Brang Ene	PENGEMBANG Rencana	""	
372	372	2022	2052-07-07T00:00:00	Brang Ene	PENGEMBANG Realisasi	""	0
373	373	2022	2052-07-08T00:00:00	Maluk	BSPS (APBN) Rencana	0.0	
374	374	2022	2052-07-08T00:00:00	Maluk	BSPS (APBN) Realisasi	0.0	0
375	375	2022	2052-07-08T00:00:00	Maluk	APBD I Rencana	""	
376	376	2022	2052-07-08T00:00:00	Maluk	APBD I Realisasi	""	0
377	377	2022	2052-07-08T00:00:00	Maluk	APBD II Rencana	0.0	
378	378	2022	2052-07-08T00:00:00	Maluk	APBD II Realisasi	0.0	0
379	379	2022	2052-07-08T00:00:00	Maluk	DAK (APBN) Rencana	""	
380	380	2022	2052-07-08T00:00:00	Maluk	DAK (APBN) Realisasi	""	0
381	381	2022	2052-07-08T00:00:00	Maluk	BAZNAS (CSR) Rencana	""	
382	382	2022	2052-07-08T00:00:00	Maluk	BAZNAS (CSR) Realisasi	""	0
383	383	2022	2052-07-08T00:00:00	Maluk	PENGEMBANG Rencana	""	
384	384	2022	2052-07-08T00:00:00	Maluk	PENGEMBANG Realisasi	""	0